Buying guide · 3 min read

What Happens at a Battery Site Inspection?

Quick answer

A site inspection is where a battery quote becomes a fixed price. The electrician checks your switchboard, where the battery can safely go, how far the cables run, your existing solar and inverter, your phase and whether you want blackout backup. It usually needs someone home and access to the switchboard and meter.

Panda Power install in Russell Lea NSW: 49 kWh GoodWe battery
Our install in Russell Lea NSW

Why is there an inspection before the fixed quote?

Every home is wired differently. Two houses can want the same battery and need very different work: one has a modern switchboard with spare room and a garage wall next to it; the other has an old board, no space and a battery spot on the far side of the house. The inspection turns a proposal into a fixed price that covers the actual job.

What does the electrician check?

  • The switchboard. Its age, condition and spare room, safety switches, and whether it needs work before a battery can be connected.
  • The battery location. A safe spot that meets the installation rules and the maker's requirements, with enough clearance and protection from direct sun and weather.
  • Cable runs. How far it is from the battery to the switchboard and inverter, and how cables will be routed.
  • Your solar and inverter. Whether the existing inverter can work with a battery, or whether a hybrid inverter makes more sense. See hybrid inverters explained.
  • Your phase. Single-phase or three-phase, which changes the equipment.
  • Backup. Which circuits you want to keep running in a blackout, if any.
  • Network rules. What your network allows, so the application can be lodged.

How do I prepare?

  1. Have a recent electricity bill handy.
  2. Make sure the switchboard and meter box are easy to reach.
  3. Think about where you would like the battery, and any spots you would rather avoid.
  4. Write down what you want backed up in a blackout.
  5. Mention anything coming up: an EV, a pool, a renovation or electric heating.

What happens after the inspection?

You get a fixed quote that names the equipment, the battery's capacity, the warranties and the work, with anything beyond a standard install listed separately. Nothing is booked until you agree to it.

A real example

We installed a 49 kWh GoodWe battery in Russell Lea for a busy household that wanted to rely on the grid as little as possible. A battery that size needs the location, cabling and switchboard planned properly, which is exactly what the inspection is for.

Ready for yours?

Request a free proposal and we will arrange the inspection at a time that suits you.

Related project

A real Panda Power install that shows this topic in practice.

FAQs

Do I need to be home for the inspection?
Usually yes, or someone who can give access to the switchboard, meter box, roof space if needed and the spot where the battery may go.
Does the inspection cost anything?
At Panda Power the proposal and site inspection come before you commit to anything, and the fixed quote follows the inspection.
Can the inspection change the price?
It can, because it shows the real work involved, such as switchboard changes or a longer cable run. That is why a fixed quote comes after the inspection, with any extra work listed separately.

Related guides

More practical guides from the Panda Power team.

Panda Power install in Gymea Bay NSW: 16.64 kWh GoodWe battery

Buying guide · 3 min read · 31 October 2026

Do I Need a Switchboard Upgrade for Solar or a Battery?

Older switchboards can need work before solar or a battery is added. Here is what installers look for, why it matters for safety, and how it's quoted.

Read article →
Panda Power install in Braemar NSW: 10.1 kW solar + 33 kWh GoodWe battery

Buying guide · 3 min read · 13 October 2026

What Should a Solar Installation Quote Include?

A good solar or battery quote names the exact equipment, sizes, warranties, extra work and who installs it. Use this checklist to compare quotes fairly.

Read article →