Often, yes. Adding panels depends on whether your inverter has spare capacity, whether new panels can be wired safely alongside the old ones, how much roof space is left, and what your network allows. Sometimes a second, separate system or an inverter upgrade is the cleaner answer.
Our install in Heckenberg NSW
Why add panels?
Homes change. A new EV, a pool, a battery or switching from gas to electric can leave an older system too small. Adding panels can bring production back in line with your usage.
What has to be checked first?
The inverter. Does it have spare capacity and a free input? Many older inverters were sized exactly for the original panels.
The panels. New panels rarely match old ones electrically. Mixing them on one string can drag down both.
The roof. Is there unshaded space left?
Network rules. Your network sets limits on connected capacity and exports.
Rebates and paperwork. Additions have their own rules. Your installer handles the paperwork.
What are the usual options?
Add a string to the existing inverter, if it has spare capacity and a free input.
Add a second, separate system with its own inverter.
Replace the inverter with a larger or hybrid model that takes both old and new panels. This is often the right moment to make the system battery-ready.
Is it worth it versus a battery?
It depends on when you use power. If your existing system already exports a lot at midday, more panels add more exports. A battery may do more. If your daytime use has grown, more panels may be the better step. Sometimes it is both.
A real example
We added 3.3 kW of new AIKO panels to a Heckenberg home that already had 6.6 kW of solar, together with a 33 kWh GoodWe battery. The extra panels give the battery more surplus to charge from, and the existing system kept doing its job.
What should you send us?
A photo of your inverter label, a photo of the roof and a recent bill. That tells us most of what we need to suggest the right option before we inspect.
Related project
A real Panda Power install that shows this topic in practice.
base prices after rebates, inc GST, as at October 2026
What affects the price: battery size, brand and inverter, whether you already have solar, backup wiring, and any additional work at your home.
Base price for a standard install, after government rebates, inc GST, as at October 2026. Additional work such as switchboard upgrades, three-phase changes or complex installs is reviewed and quoted separately.
Usually not on the same string, because different panels have different electrical ratings. New panels are normally wired on their own string, inverter input or a separate inverter.
Do I need network approval to add panels?
Usually, yes. Any change to the connected solar capacity needs approval from your network, which your installer applies for.
Will adding panels affect my existing warranty?
It can affect the workmanship warranty from your original installer. Check your paperwork, and ask your installer before work starts.