Sizing · 3 min read · 1 October 2026
Is an East-West Roof Good for Solar Panels?
East-west roofs make less at noon but spread solar across the morning and afternoon. Here is when that suits a home, and what to watch for.
Read article →Sizing · 3 min read
Quick answer
Shade affects solar more than most people expect, because panels are wired in groups and a shaded panel can hold back the others in its group. Good design avoids the worst of it: placing panels away from shade, splitting groups across inverter inputs, and using optimisers where shade can't be avoided.

Panels are usually wired together in a string. Power flows through the string like water through a hose: if one panel is shaded, it can restrict the flow for the whole string. Panels have built-in bypass diodes that let current skip around shaded sections, which limits the damage, but a shadow across part of a string can still cost far more than the shaded area suggests.
Check your inverter app on clear days. A dip at the same time every day often lines up with a shadow passing over the panels. Seasonal changes are normal as the sun moves, but a growing dip over months often means a tree is getting taller.
We installed 7.6 kW of Jinko panels with a 49 kWh GoodWe battery in Turramurra. The upper North Shore has some of Sydney's tallest trees, so on homes there we look at where shadows fall through the day before deciding where the panels go and how they are grouped.
We check every roof face for shade at different times of day and design around it. If shade means a system won't perform well, we say so plainly.
A real Panda Power install that shows this topic in practice.
Home batteries from $6,999 to about $15,999
base prices after rebates, inc GST, as at October 2026
What affects the price: battery size, brand and inverter, whether you already have solar, backup wiring, and any additional work at your home.
Base price for a standard install, after government rebates, inc GST, as at October 2026. Additional work such as switchboard upgrades, three-phase changes or complex installs is reviewed and quoted separately.
More practical guides from the Panda Power team.
Written by the Panda Power team from our own installs and the questions customers ask us.
56 days left
Install before 1 January 2027